In July 2024, southern Ontario experienced a record amount of rainfall in a single day. Widespread flooding happened in many municipalities, and in Toronto, the Don Valley Parkway in Toronto was closed due to the flooding. Municipalities are still dealing with the aftermath of this rainfall, and the question on many a municipal risk manager’s mind is “can a municipality be found liable for flooding of our residents’ land”.
The Superior Court of Justice, on July 24, 2024, issued reasons in National Steel Car. v. City of Hamilton et. al. 2024 ONSC 4120 tackling this very question. The Plaintiff in this case was the owner of a manufacturing facility in Hamilton’s north end. The Plaintiff’s property repeatedly flooded following heavy rain, allegedly as a result of a drainage channel known as the Kenilworth channel located on the west boundary of the Plaintiff’s property. As a result of this flooding, the Plaintiff commenced suit against the City, the Hamilton Port Authority, and DoFasco, the owner of the adjacent land, claiming damages in excess of $5,000,000.00 for the cost of anti-flood measures, as well as injunctive relief compelling the Defendants to repair/maintain the channel so as to avoid future flooding, and punitive damages.
The Plaintiff’s theory was that the flooding was caused by the north Hamilton’s sewer system becoming surcharged during periods of heavy rain and draining into the Kenilworth channel. Over the years, this resulted in sediment being deposited in the channel, which both reduced the channel’s capacity and resulted in four culverts along the length of the channel becoming blocked. The Plaintiff also alleged that DoFasco’s actions materially contributed to the flooding through the construction of bridges, gantries and pipes in the channel, without the City’s consent. The Plaintiff alleged that the Defendants were aware of this problem for many years, and did nothing to put a stop to it.
Defences raised by the City included a denial of responsibility for the water coming off Dofasco’s property or DoFasco’s conduct in infilling the channel without the City’s consent. The City also made a claim for set-off, on the basis that the Plaintiff had withheld over $7 million in property taxes in protest of the flooding, but had failed to use any of this money to mitigate its damages by taking meaningful anti-flood measures. Both Defendants also took issue with causation, alleging that the flooding in question was due to increased water levels in Lake Ontario rather than the Kenilworth channel overflowing due to infilling and lack of maintenance.
Gibson J, who heard the trial of this matter, found the City and Dofasco liable in nuisance, negligence and pursuant to the Rule in Rylands v. Fletcher. He also ordered an injunction compelling the City and Dofasco to carry out remedial work on the channel, although oddly he did not direct that the Plaintiff build the flood wall in respect of which it claimed damages. He noted that there was consensus amongst all parties’ experts at trial that the flooding was caused by sewer outflow running into the Kenilworth channel, and that although rising lake levels might reduce the capacity of the channel, lake water had never flooded the Plaintiff’s lands. It was also found that DoFasco’s infilling of the channel was part of the problem.
Gibson J.’s comments upon the accepted standard of practice for maintenance of a drainage channel, as established by the testimony of the experts for all three parties, are of assistance to municipalities in determining what needs to be done in order to avoid flooding. Based on this decision and Gibson J’s comments, the standard of care for the maintenance of stormwater management channels includes:
- Removal of debris jams and fallen trees;
- Identifying significant slope destabilization in the channel;
- Identifying overgrowth impeding the culverts;
- Repairs to collapsed culverts;
- Cleaning out significant sediment buildup;
- Culvert replacement as necessary.
It was also noted that the City had a by-law prohibiting the obstruction of any open or closed drainage facility or watercourse, which gave the City the power to order anyone in breach to do all necessary work to remove the obstruction. Gibson J found that the City had failed to enforce this bylaw, despite the Plaintiff’s complaints. The City’s witnesses, according to Gibson J.’s reasons, did not have any explanation as to why maintenance had not been done or why the bylaw had not been enforced. Gibson J observed that because the channel had been neglected for so long, remedial work had become prohibitively expensive, which appeared to be the main reason the City did not address this matter when the Plaintiff initially raised concerns.
In terms of punitive damages, Gibson J found that both Defendants’ conduct was deserving of punitive damages. Curiously, he stated that part of the basis of the City being liable for punitive damages was because it had not made any admissions at trial, including refusing to acknowledge ownership of the channel. This award is outside of the norm as typically the failure to make reasonable admissions in an action is something taken into account in assessing costs, rather being a rationale for the award of punitive damages. However, Gibson J felt that the conduct on the part of the City that allegedly gave rise to an entitlement of punitive damages was blunted by the Plaintiff’s withholding of property taxes, which he described as “an illegal act of petulance”.
The key lesson to be learned from this case is that a municipality that does not abide by its own policies simply due to the cost of these policies, or as a result of its prior neglect in this regard, will face liability. A municipality has to take reasonable and proactive steps to maintain its own infrastructure, and to enforce applicable by-laws on its books. Should a municipality fail to do so, as the City of Hamilton was found to have done in this case, it appears likely that it will be found liable for the consequences to its residents and taxpayers.
It is important to keep in mind, though, that this case does NOT stand for the proposition that a municipality has to embark on large capital projects to prevent flooding and other similar phenomena. This was not a case where the City’s sewer system was inadequate and it was required to upgrade it. This remains the domain of policy decisions, which are not subject to judicial scrutiny, whereas maintaining existing infrastructure once it is in place is clearly an operational decision which is, of course, actionable.
The City of Hamilton as appealed this decision. Boghosian + Allen LLP will be following this matter and will report the outcome once this case has been considered by the Ontario Court of Appeal.